Power-as-a-Service · Behind the meter

The grid for AI.

Built, owned, run by us. Power your AI in 90 days.

Engineers from · GE · Lucid Motors · Silicon Valley
Initial deployment · 2027 TX · VA · AZ · WY · OH · PA
Scroll

The grid is over. Interconnects take a decade. AI does not wait a decade. BrayCore is the grid that does not.

Why we exist

Why we exist.

The most important technology of our lifetime is throttled by the slowest part of the economy.

AI doubles every six months. The grid takes a decade to deliver a substation. Not a temporary mismatch. A structural failure.

BrayCore refuses to accept it.

We are building the grid that ships at the speed of intelligence. Factory-built, owned by us, operated by us, paid for by the kilowatt-hour. Not waiting for the utility. We are the alternative.

Engineers from GE, Lucid Motors, and Silicon Valley. Time-to-power is the next competitive frontier of compute. That is our conviction.

If your AI is power-blocked, talk to us this week.

BrayCore · 2026 The grid for AI.
What we do

One contract. One block. One company.

Designed, financed, permitted, built, owned, and operated by us. Every risk between gas and grid is ours.

Sign a 10-year fixed-rate PPA. Power behind your meter in 90 days. Pay per kilowatt-hour. Done.

Factory-built. Modular. Five to one hundred megawatts. Same architecture, different deployment.

90 days
Contract to first MW
5–100 MW
Per site
24/7
We operate
10 yr
Fixed-rate PPA
For the technical detail. Download spec sheet →
Where we are

Where we are.

Pre-commercial. First sites 2027. Six US states. International in development.

ARIZONA WYOMING TEXAS OHIO PENNSYLVANIA VIRGINIA Initial deployment market · target 2027
International · In development UK · GERMANY · INDIA · SINGAPORE

Not on the map? Ask. The map moves.

Reserve capacity

Reserve capacity.

Tell us about your site. Reply within one business day.

Every inquiry is read. If your timeline is urgent, say so. We move first on urgent.